Sunday, 15 May 2011

Risk Assessment NO 3 & 4

By now we have a lot of footage but we also need some bits and pieces so we have created another two risk assessments.
Risk Assessment for Shoot 3- Beech Studio, Stanmore College
Production persons involved: Nora (myself), Ariba Ahmed and Warsan Barquadle and artist, Crucial (Usman Mirza)
Hazard:  Equipment
Nature of Risk: The big bulky equipment could be in the way and easily trip up crew and artist.
Preventative measures: We are going to rearrange the equipment in a neat order, we can avoid bumping into it.
Hazard: Loose wires in the studio
Nature of Risk: there are many wires in the Beech Studio, it’s very easy to confuse it with our equipment especially if we take out lights. It can also be a hazard because it’s very easy to trip over.
Preventative measures: We could tidy the room of all loose wires and equipment before we start to set up our own equipment.
Risk Assessment for Shoot 4: TV Studio, Stanmore College
Production persons involved: Myself
Hazard: Noise
Nature of risk: noise from  next door may distract team members and more importantly the artists so we may not all work tot he best of our potential
Preventive measures:  before we start shooting, inform the people next door so they don’t make unnecessary noise  

No comments:

Post a Comment